![]() ![]() (ii) A Cost Object – It is an item for which cost measurement is required e.g. (i) Activity – Activity means any event that incurs cost. ![]() Therefore, in order to overcome the inadequacies of traditional methods of overhead absorption, Activity Based Costing has been devised. ![]() The new manufacturing technology demands the feedback of performance while production is still in progress.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |